sadikshyapoudel015
sadikshyapoudel015 sadikshyapoudel015
  • 03-02-2022
  • Mathematics
contestada

a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

A. Is ADE ~ABDB.Is ADE ~BDC
Which example reflects ad hominem logical fallacy ?
need help cause im not sure or how to do it
Juan, a professor of psychology, is developing a measure of skills needed for successful performance at a job. Juan includes items the job supervisor feels are
micro environment essay​
what agricultural is practiced in or near San Diego? Choose a food that is grown or produced locally. Describe the food,Where and when is the food produced and
Could there be a frameshift mutation that would not affect the structure and function of the resulting protein? Explain your answer.
Solve the system of equations using elimination. How many solutions does the system have? 15x + 12y = 18 5x +4y = 6
Which of these expressions is equivalent to z + 2 + 2 + z? 4 + z A B 4 +24 с 42 o o 424
Which of the following is the equation for the graph shown?