A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

what is the ratio of ounces to pounds
the quotient of 3 and the product of 2 and a number
Which civil rights leader was said to be the most famous southern man since Jefferson Davis and was loved by whites and blacks? A. George Washington Carver B
Which of the following does not accurately depict a scientific theory
In England, mercantilism created a skilled industrial population and a large what? industry
Which cycle includes bacteria taking gas from the atmosphere and converting it into a material that plants can absorb through root systems? A. The phosphate cy
Can someone please explain to me (in steps) how to round decimals to the nearest half? Thanks!!
0.12 as a fraction in its simplest form
A history of a person's life told by another person is known as a(n): A. Auto-Biography B. Biography C. Non-Fictional Biography D. Fictional Biography
What is the main factor that changes rocks during contact metamorphism? A. heat B. pressure C. chemical environment