carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

What are the x- and y- coordinates of point P on the directed line segment from A to B such that P is 1/3 the length of the line segment from A to B?(1, 5)(0,
Two students in your class, Ralph and Bobby, are disputing a function. Ralph says that for the function, between x = −1 and x = 1, the average rate of change is
How would u solve for this
Discuss how far Muslim traders carried Islam to the east.
What was one affect on the British winning the French and Indian war
What is the measure of ∠ABD?
I need much help on number 5
What is the sum of the measures of two complementary angles? A. 270° B. 45° C. 180° D. 90°
Which part of this sentence is notcorrect?Estas muchachos altos son los hermanos de Rosa. A. altos B. muchachos   C. Estas   D. los
The polynomial function with rational coefficients has roots of: –2, √3, and - √3. What is the equation? f(x)= _____ (x + 2)(x - 2)(x + √3) a (x + 2)(x +√3)